Excavating & Construction Projects

Latest Projects

Spacious empty industrial hall with sinks and metallic walls.

Bayer Corp Office Renovation

Dekalb, IL
  • Revitalized a 3,000 square-foot office space.
  • Managed demolition and concrete repairs.
  • Installed steel stud framing,drywall,...
Aerial view of active construction site with machinery and trucks.

Growmark Fertilizer Storage and Transfer Building

Seneca, IL
  • Executed all excavation services for this cutting-edge facility.
  • Completed demolition, site preparation, aggregate base installation,...
Aerial view of large concrete lot with tanker truck.

Chevron Renewable Energy Group

Seneca, IL
  • Upgraded truck load out terminal with extensive milling services and concrete paving.
  • Constructed a one...
Aerial view of industrial construction site with machinery.

Toyal America Aluminum Unit

Lockport, IL
  • Provided civil services including demolition, site work, grading, and aggregate bases installation.
  • Completed all concrete...
Aerial view of construction site with concrete pouring activity.

In-Ground Wastewater Treatment Facility for Yes Communities

Seneca, IL
  • Managed the installation of a 50 by 90 foot self-contained pre-package sewage facility at Country...
Workers and excavator at construction site under blue sky.

Vector Pipeline Project

Joliet, IL
  • Assisted with the installation of new piping and metering systems.
  • Installed approximately 50 helical piers...
Aerial view of a park with winding paths and parking.

Lake Chaminwood Preserve Expansion

Channahon, IL
  • Worked with the Forest Preserve District of Will County and WBK Engineering.
  • Installed new walking...
Construction site with workers and steel rebar framework.

REG Cooling Tower Basin

Seneca, IL
  • Excavation: Prepare the site with expert excavation services.
  • Concrete Work: Construct the concrete base necessary for new...

JB Hunt Site Development

Chicago, IL
  • Site Work: Manage all earthwork and grading activities.
  • Underground Utilities: Install essential utilities below ground.
  • Site Lighting: Illuminate...
Workers examining underground pipes at construction site.

Shorewood Sanitary Force Main

Shorewood, IL
  • Installation: Place a 14-inch force main within a 30-inch casing pipe.
  • Location: Navigate the installation under Interstate...
Call us today at (815) 942-1905

Bayer Corp Office Renovation

  • Revitalized a 3,000 square-foot office space.
  • Managed demolition and concrete repairs.
  • Installed steel stud framing,drywall, and metal siding.
  • Partnered with Swedberg Electric, Trailblazer Plumbing, Marseilles Sheet Metal, and Smith Painting for an open floor design accommodating a new shelling line.

Growmark Fertilizer Storage and Transfer Building

  • Executed all excavation services for this cutting-edge facility.
  • Completed demolition, site preparation, aggregate base installation, and utility work.
  • Provided comprehensive concrete foundation and flatwork for a new efficient conveyor system.

Chevron Renewable Energy Group

  • Upgraded truck load out terminal with extensive milling services and concrete paving.
  • Constructed a one million gallon tank pad, preparing for future storage needs through demolition and new foundation installation.

Toyal America Aluminum Unit

  • Provided civil services including demolition, site work, grading, and aggregate bases installation.
  • Completed all concrete foundations and flatwork for the new building and pipe rack.

In-Ground Wastewater Treatment Facility for Yes Communities

  • Managed the installation of a 50 by 90 foot self-contained pre-package sewage facility at Country Acres.
  • Collaborated with Ficek Electric, Atlas Crane, DPI Systems, Trailblazers Plumbing, and Acosta Fence for an advanced system.
Workers and excavator at construction site under blue sky.

Vector Pipeline Project

  • Assisted with the installation of new piping and metering systems.
  • Installed approximately 50 helical piers with state-of-the-art equipment, providing torque data and specifications.

Lake Chaminwood Preserve Expansion

  • Worked with the Forest Preserve District of Will County and WBK Engineering.
  • Installed new walking paths, parking lots, and the preserve’s first ADA accessible kayak dock.
Construction site with workers and steel rebar framework.

REG Cooling Tower Basin

  • Excavation: Prepare the site with expert excavation services.
  • Concrete Work: Construct the concrete base necessary for new cooling units.

JB Hunt Site Development

  • Site Work: Manage all earthwork and grading activities.
  • Underground Utilities: Install essential utilities below ground.
  • Site Lighting: Illuminate the area with comprehensive lighting solutions.
  • Paving: Lay down durable paving across 17 acres for a transportation staging area.
Workers examining underground pipes at construction site.

Shorewood Sanitary Force Main

  • Installation: Place a 14-inch force main within a 30-inch casing pipe.
  • Location: Navigate the installation under Interstate 55 in Shorewood.